Our Developments

Delivered

Coventry

Abbey House

WE HAVE CONSTRUCTED A BRAND NEW 115 BED STUDENT ACCOMMODATION SCHEME FOR EREC ESTATES ON MANOR ROAD, COVENTRY.

PROJECT OVERVIEW

Abbey House is a seven storey building designed to create 60 luxury Studio apartments and 11 cluster flats containing 55 bedrooms equating to 115 student beds.  The new build offers 115 student rooms consisting of 60 studios and 55 cluster bedrooms in the heart of Coventry City Centre, with great access to Coventry central train station and university campus.

 

 

Coventry

JULIAN COURT

WE HAVE CONSTRUCTED A BRAND NEW 66 STUDIO BED STUDENT ACCOMMODATION SCHEME FOR EREC ESTATES ON REGENT STREET, COVENTRY.

PROJECT OVERVIEW

The new build offers 66 studio bed student apartments in the heart of Coventry City Centre, with great access to Coventry central train station and university campus. The scheme has been designed and built with a combination of external brickwork, feature cladding, rain screen and anthracite windows. Each room boasts an NSP locking system (key fob entry) and a booster heating system. Julian Court also has available to its resident a communal garden and on-site laundry facility.

 

In Construction

Sheffield

BAILEY STREET

290 STUDENT BED ACCOMMODATION SCHEME IN THE HEART OF SHEFFIELD CITY CENTRE.

PROJECT OVERVIEW

 

This 8 storey new build student accommodation development in the heart of Sheffield will house  73 studio and 147 cluster bedrooms. To meet the requirements for 2019 student intake, Torsion has sourced an offsite light gauge steel frame developed by Sigmat.

 

 

Birmingham

TOY BOX

290 STUDENT BED ACCOMMODATION SCHEME IN THE HEART OF BIRMINGHAM CITY CENTRE.

PROJECT OVERVIEW

The 290-bed Toy Box student accommodation development in Birmingham City centre has a 9-meter-long cantilevered floor at first-floor level. Working in collaboration with our design partners Design2e, our design team has engineered the design to hold the weight of the 14 stories above. The nearby train line also meant that no load was to be imposed on the ground beneath the cantilever.

 

 

 

Pipeline

0

Beds to be delivered by 2020